2018 Sidewalks

Sidewalks are an essential part of the city’s infrastructure, providing connections for pedestrians and cyclists (non-motorized). The 2018 plan is a mix of replacement of deteriorated sidewalks, which were difficult to walk on, and new sidewalks to complete important connections.

​The table below lists the current tentative 2018 sidewalk projects.  For more information on a specific project, please refer to the ward page.

2018 Sidewalk Project List

Ward Street Name From Segment To Segment Status
1 MLK Jr. Blvd. College Ave. Washington Ave. In Progress
1 Huntsville Rd. Blair Ave. Morningside Dr. Incomplete
2 Dickson St. Washington Ave. Willow Ave. Complete
2 Meadow St. Block Ave. East Ave. Incomplete
2 Green Acres Rd. Poplar St. College Ave. Incomplete
3 Mission Blvd. East Oaks Dr. Crossover Rd. Incomplete
4 Carriage Way Beaver Ln. Wedington Dr. Complete
4 Patrick St. Boxley Ave. Lonesome Dove Complete
4 Meadowlands Wedington Dr. Existing Sidewalk Complete
4 Salem Rd. Fairfax St. Wedington Dr. Incomplete